Trinity Lutheran School Neenah

Built: Summer of 2014

Constructed a very complicated Design-Build addition to the existing 1959 school building.  Focus of project was added safety, visibility, and accessibility.   School offices were moved to the first floor, entrance lobby/atrium to replace existing entrance onto stair landing, added shaft/openings and 4 stop elevator, interior on grade link of school and gymnasium, added conference room, and interior mechanical revisions to make it all work.

Notable:  Very tight urban site.  Budget conscious, but lots of needs fulfilled.  Extremely tight schedule to meet new school year opening.